Project references, organized for RFQ decisions.
Project references are grouped by application, supply scope and delivery requirements, with clear RFQ inputs for engineering review.
Project references by site condition and supply scope.
Application references show site type, equipment family, supply scope and RFQ document requirements without unsupported customer claims.
New-energy substation package
For solar, storage and distributed energy sites where compact outdoor equipment, protection logic and project packing need to be coordinated.
02
Industrial plant distribution upgrade
HV switchgear, LV cabinets and distribution boxes aligned to feeder requirements.
03
Prefabricated electrical cabin delivery
Controlled electrical room, factory assembly and easier on-site placement.
04
Harsh-environment outdoor equipment
Enclosure rating, coating, ventilation and maintenance access for difficult sites.
Project paths by application scenario.
Application paths connect market scenario, equipment scope, drawings, document requirements and related product systems.

Check the technical basis.
Review drawings, load list, voltage level, installation environment and required document package.
Define the cabinet set.
Match substations, switchgear, RMUs, LV cabinets, boxes and supporting transformer scope where relevant.
Control before dispatch.
Coordinate routine inspection, visual checks, packing confirmation and project document control.
Prepare what buyers need.
Keep quotation, layout notes, packing list and after-sales response aligned with the confirmed scope.
Send drawings, load list and target schedule.
For project quotations, include voltage level, rated current, short-circuit level, circuit quantity, installation environment and any required document standard.








