JSGK supplies Delivery and Installation Guide for substations, switchgear rooms, industrial facilities and new-energy project sites.

~10 min read For first-time importers No freight-forauxiliary electrical roomser jargon
The full picture
The freight bill is the half of the price nobody quotes you.

Typical quotation inputs include voltage level, rated current, short-circuit level, transformer capacity, circuit quantity, site environment, drawings and required documents.

1. Who’s responsible for what (Incoterms in one minute)

Final configuration is confirmed from approved datasheets, single-line diagrams, cabinet arrangement drawings and project standards before production.

2. How it actually loads

Factory-side work can include equipment assembly, secondary wiring, routine inspection, outgoing inspection, packing and document preparation according to the confirmed scope.

3. At your port

For outdoor or site-side equipment, clarify IP protection, corrosion environment, ventilation, foundation, cable entry and maintenance access during the RFQ stage.

What moves the number
What actually drives your freight cost.

Factory-side work can include equipment assembly, secondary wiring, routine inspection, outgoing inspection, packing and document preparation according to the confirmed scope.

01
Volume / equipment loading

For outdoor or site-side equipment, clarify IP protection, corrosion environment, ventilation, foundation, cable entry and maintenance access during the RFQ stage.

02
Equipment type

JSGK supports project buyers with product selection, scheme confirmation, factory coordination and documentation for electrical distribution equipment orders.

03
Port pair & route

Our team can prepare cabinet layouts, technical datasheets, inspection records and delivery documents according to the confirmed project scope.

04
The Incoterm you agree

Send the product family, electrical parameters, quantity, project location and delivery schedule so the sales and engineering team can prepare a focused quotation.

JSGK supplies Delivery and Installation Guide for substations, switchgear rooms, industrial facilities and new-energy project sites.

Gate to site
From our gate to your site, in six steps.

Typical quotation inputs include voltage level, rated current, short-circuit level, transformer capacity, circuit quantity, site environment, drawings and required documents.

01 — Quote & Incoterm

Final configuration is confirmed from approved datasheets, single-line diagrams, cabinet arrangement drawings and project standards before production.

What happens
Price, Incoterm, port of loading, destination port and payment terms are locked in writing.
Who handles it
Both parties agree; you confirm your nominated port and any local freight forauxiliary electrical roomser.
More
02 — Production & QC

Factory-side work can include equipment assembly, secondary wiring, routine inspection, outgoing inspection, packing and document preparation according to the confirmed scope.

What happens
Units are built to spec, pass our internal inspection process, and are staged for loading.
Who handles it
We handle production and QC. Third-party inspection is available on request.
More
03 — Loading & Docs

For outdoor or site-side equipment, clarify IP protection, corrosion environment, ventilation, foundation, cable entry and maintenance access during the RFQ stage.

What happens
Equipment Delivery plan executed, export customs cleared, commercial invoice and packing list issued.
Who handles it
We handle loading and export docs. Under EXW, you arrange the truck to port.
More
04 — Ocean Freight

JSGK supports project buyers with product selection, scheme confirmation, factory coordination and documentation for electrical distribution equipment orders.

What happens
Vessel transit on the agreed trade lane. Tracking details shared when available.
Who handles it
Under FOB, you book the vessel. Under CIF/DAP, we arrange and pay for ocean freight.
More
05 — Customs Clearance

Our team can prepare cabinet layouts, technical datasheets, inspection records and delivery documents according to the confirmed project scope.

What happens
Import declaration filed, duties and taxes assessed and paid, equipment released.
Who handles it
Always you or your customs broker — we supply the full documentation set to support this.
More
06 — Delivery & Unload

Send the product family, electrical parameters, quantity, project location and delivery schedule so the sales and engineering team can prepare a focused quotation.

What happens
Inland haulage to site, crane or forklift unloading, equipment returned or kept as agreed.
Who handles it
You arrange inland haulage and site lifting. Under DAP we deliver to the named location.
More
FAQ
Questions first-time importers always ask.

JSGK supplies Delivery and Installation Guide for substations, switchgear rooms, industrial facilities and new-energy project sites.

Who arranges shipping — you or us?

Typical quotation inputs include voltage level, rated current, short-circuit level, transformer capacity, circuit quantity, site environment, drawings and required documents.

What’s the practical difference between FOB and CIF?

Final configuration is confirmed from approved datasheets, single-line diagrams, cabinet arrangement drawings and project standards before production.

How many units fit in an export shipment?

Factory-side work can include equipment assembly, secondary wiring, routine inspection, outgoing inspection, packing and document preparation according to the confirmed scope.

Do you handle customs clearance at my end?

For outdoor or site-side equipment, clarify IP protection, corrosion environment, ventilation, foundation, cable entry and maintenance access during the RFQ stage.

How long does shipping take?

JSGK supports project buyers with product selection, scheme confirmation, factory coordination and documentation for electrical distribution equipment orders.

What if it arrives damaged?

Our team can prepare cabinet layouts, technical datasheets, inspection records and delivery documents according to the confirmed project scope.

Ready to move forauxiliary electrical rooms?
Know what it’ll cost to ship?

JSGK supplies Delivery and Installation Guide for substations, switchgear rooms, industrial facilities and new-energy project sites.

Typical quotation inputs include voltage level, rated current, short-circuit level, transformer capacity, circuit quantity, site environment, drawings and required documents.